Uses of CPM & PERT in Construction Projects

Spread With Love:

5
(7)

CPM and PERT in construction projects are the tools used for efficient management of activities. CPM is the Critical Path Method and PERT is Program Evaluation and Review Technique. In this article, I will try to briefly introduce uses of CPM & PERT in Construction Projects. If you have any doubt about this article, please let me know in the comment box below.

Let’s learn together (Don’t forget to share)

The Critical Path Method:

The Critical Path Method (CPM) was first used during the overhauling of a chemical plant in the United States in the year 1950 by Morgan R. Walker of DuPont and James E. Kelley, Jr. of Remington Rand. By using this technique of activity management, they substantially reduced the time of overhauling of the chemical plant.

Program Evaluation and Review Technique:

Program Evaluation and Review Technique (PERT) was first used in 1957 in the United States for the design and development of the Polaris missile. With the objective of meeting a specified completion date for the project two years in advance of the earliest possible date predicted by traditional planning methods the U.S. Naval dept. devised this new technique.

CPM and PERT in Construction Projects:

The difference between the CPM and PERT is that the PERT is mainly used where the time required for completion of each of the activities involved cannot be accurately defined nor are the resources to be used for the activity readily available. The events could, however, be readily definable. For example, for a construction project type, which have not been completed anywhere in the past, when it is possible to say that with reasonable accuracy that an activity “A” has to be completed before activity “B”, but the time required to complete the activity “A” is not known or the completion time of activity “B” is uncertain, in that case, PERT technique is used. This technique is based on the probabilities of completing each activity in time. The time is not of much importance in this technique, and completion of each event is taken care of. This technique is, therefore, most suited to projects like research and development, investigation, design etc. Also PERT because of the large number of calculations involved is essentially a computer-based system.

READ MORE:  Some of the Best GATE Civil Engineering (CE) Books 2023

cpm-vs-pert-in-construction-planning

CPM technique is used in construction projects based on the knowledge and experience of the past projects for predicting accurately the time required for various activities during the execution of the project. The time required for each activity is known and defined for the project. Hierarchy of the construction project events are well defined and time of completion of the same is also defined. The total time required for the given project can be estimated based on this technique. CPM is an activity-oriented system as the times required for construction activities are estimated more accurately. CPM is used where activities are definable and measurable and the minimum overall cost is of the utmost importance.

Most large projects can be portrayed by a graph or network of jobs. Characteristics of construction projects to make it amenable for analysis by PERT or CPM are:

  • The project must consist of a well-defined collection of jobs or activities which when completed will mark the end of the project.
  • The jobs must be such that they can be started or stopped independently of each other within a given sequence, (e.g. certain continuous flow processes such as oil refining, where jobs or operations must follow one after another with essentially no time separation, are not amenable for analysis by PERT or CPM).
  • The jobs are ordered i.e. they must be performed in Technological sequence (e.g. the foundation of a wall must be completed before the wall can be built).

cpm-n-pert

PERT and CPM are tools used for managing the construction project activities and if followed thoroughly, the construction project can be completed within the time limit and within the cost. But the use of these tools does not guaranty the desired outcome due to bad management problems, natural calamities, strikes by labours etc. Howsoever good a tool may be its success depends on how well the tool is used. The CPM Network affords management with information for making decisions and focusing its attention to essential operations.

READ MORE:  35 Construction Tools List and their Uses with Pictures

I hope this article will help you. You may also want to see my other post from my Blog.  If I have missed anything here, please let me know about that in the comment below this post.

Share it with your friends.

Happy Learning.

If you liked this article, then please help me to share this article with your friends through Facebook, Twitter, WhatsApp or Google+. You can also find us on FacebookTwitter, and Google+.

Download This Post:

 

How useful was this post?

Click on a star to rate it!


Spread With Love:
Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments

Join Our Newsletter!

And don’t worry, we hate spam too! You can unsubscribe at any time.

Signup today for free and be the first to get notified of new updates & offers.

Scroll to Top
Scroll to Top